Serving Billings & the Yellowstone Valley
Ostermiller Construction Concrete & Asphalt · Billings MT
Our Services

Concrete Driveways in Billings, MT

Concrete Driveways · Billings, MT

A Driveway Built for Montana Winters

A concrete driveway around Billings, Laurel, Lockwood and across the Yellowstone Valley lives a harder life than the same slab would almost anywhere south of here. It gets plowed, iced, frozen, thawed and frozen again — sometimes all in the same week. We pour concrete driveways built for exactly that: a compacted base, mix batched for exterior work in this climate, and control joints laid out so the slab manages Montana weather instead of losing to it.

We handle the whole range — new drives, full tear-out and replacement of drives that are past saving, plus extensions, aprons and parking pads. And if you're weighing concrete against blacktop, we install both sides and will give you a straight comparison — see asphalt paving — instead of selling whichever one we happen to be holding.

What We Handle

  • New concrete driveways, formed and poured start to finish
  • Full tear-out and replacement of failed drives
  • Compacted gravel base under every pour
  • Floated flat and broom-finished for winter grip
  • Control joints laid out for the slab, not a template
  • Sloped to move water away from the garage
  • Extensions, aprons and parking pads
  • Free in-person estimates

Free Concrete Driveways Quote

Tell us about your project — we’ll get right back to you.

The Base Decides How Long It Lasts

Most driveway failures don't start in the concrete — they start underneath it. Soft or poorly compacted ground settles, water finds the low spot, and the slab cracks along it. So before we pour anything, we deal with the dirt: grade it, fill where it needs fill, and compact it until the slab has ground under it that isn't going anywhere.

The pour itself follows suit: forms set straight and to grade, concrete placed, screeded and bull-floated flat, then broom-finished so tires still grip when the surface is wet or snowy. Control joints go where the slab actually needs them — spaced to the pour, not copied off a template — because concrete is going to crack somewhere, and the joints decide where.

Built for Freeze-Thaw and the Plow

Exterior concrete in cold country gets poured with air-entrained mix for a reason: millions of microscopic air pockets that give freezing water somewhere to expand without breaking the surface apart. Combine that with a finish that sheds water and a slab sloped to drain away from the garage instead of puddling against it, and you've got a driveway built for the valley's freeze-thaw swings.

We'll also tell you how to protect it while it's young — keep deicing salt off it the first winter, and give it about a week before it carries vehicles. A flat, well-jointed slab is the plow-friendly option too: no heaved edges for a blade to catch in January.

New Pours and Full Replacements

If your existing drive is cracked through, settled toward the garage, or flaking off its top layer, patching it again is money down the hole. We handle removal and replacement start to finish — old slab hauled off, base rebuilt, new drive poured right — one crew, one schedule.

And a driveway rarely stands alone. While the forms and the crew are on site, it's the efficient time to pour the walks, steps or patio in the same visit. Tell us what the whole property needs and we'll quote it as one job, anywhere on our service area.

Long ribbon of freshly poured concrete driveway Bull float smoothing a fresh concrete pour

Ready to get started?

Free, no-obligation estimates across Billings & the Yellowstone Valley.

(406) 717-4103
What You Can Expect

How a Job With Ostermiller Runs

From the first look at the job to the final walk-through, here is exactly how it goes.

1

Look at the Job

We come see the actual job — the slab, the driveway, the lot, and the ground under it. What failed, why it failed, and what the fix really is. No blind quotes over the phone.

2

Straight Quote

You get a free written quote with a real number and a real timeline. It says what's included — tear-out, haul-off, prep, materials — and it holds unless the scope changes.

3

Do the Work

The crew shows up when we said and does the job the way we quoted it — tear-out, base, forms, pour, pave, seal or stripe. Anything unexpected, you hear about it immediately, not on the invoice.

4

Final Walk-Through

We walk the finished work together before we call it done. Clean lines, clean site, old material hauled off, and clear guidance on cure times and care. Done means you say it's done.

FAQ

Concrete Driveways Questions, Answered

Common questions about concrete driveways across Billings & the Yellowstone Valley. Don't see yours? Give us a call — we're happy to help.

Call (406) 717-4103

How much does a new concrete driveway cost in Billings?
It comes down to square footage, thickness for what parks on it, how much base work the ground needs, and tear-out if an old drive is coming out first. We price it from a free in-person look at the site — a written number that holds, not a phone guess.
How long before we can park on it?
Foot traffic is fine after a day or two; keep vehicles off for about a week. Concrete keeps gaining strength for roughly a month after the pour, so a little patience up front pays off for years. We go over all of it at handoff.
Concrete or asphalt for a driveway in Montana?
Both survive here when they're built right, and we install both. Concrete costs more up front and asks the least of you afterward; asphalt costs less to install and wants maintenance — crack sealing and seal coating — every few years. Ask and we'll price your driveway both ways.
Will the new driveway crack?
All concrete cracks — anyone promising otherwise is selling something. The job is controlling where. That's what the compacted base and the control joints are for: the slab moves on the lines we give it instead of breaking across the middle. Done right, the cracking is something you never notice.
When can a driveway be poured in Montana?
Concrete wants decent weather, so the practical pouring season runs spring into fall — and in a season that short, slots go fast. Call (406) 717-4103, get the free estimate early, and get on the schedule ahead of the rush.
More From Ostermiller

Explore Our Other Services

Patios & Walkways in Billings, MT

Patios & Walkways

Patios, sidewalks, walkways and steps — formed, poured and hand-finished, sloped to drain, and built on ground that will hold them flat.

View Details
Asphalt Paving in Billings, MT

Asphalt Paving

Asphalt driveways and parking lots paved, patched and repaired — base problems fixed underneath, hot mix compacted while it's hot.

View Details
Crack Sealing in Billings, MT

Crack Sealing

Hot-applied rubberized crack seal for driveways and lots — water stays out, freeze-thaw stays beaten, small cracks never become potholes.

View Details
Seal Coating in Billings, MT

Seal Coating

Faded gray asphalt sealed back to black — a barrier against sun, water and vehicle fluids that keeps the mat flexible and the base dry.

View Details
Lot Striping in Billings, MT

Lot Striping

New lot layouts and crisp restripes — stalls, arrows, crosswalks, fire lanes and accessible parking, phased so your lot stays open.

View Details
Why Choose Ostermiller

Why Billings Property Owners Call Us

Rip Out & Replace Done Right

We do not patch over failed concrete or jack sunken slabs. Cracked, heaved or spalled flatwork gets torn out, hauled off, and poured new — done once, done right.

Concrete and Asphalt, One Crew

Most outfits do one or the other. We pour concrete and work asphalt — paving, crack sealing, seal coating, striping — so your whole property has one number to call.

Straight Written Quotes

We look at the actual job, price it in writing, and tell you what is worth doing and what is not. No phone guesses, no surprise change orders.

Billings Based, Montana Built

Based in Shepherd, minutes from Billings. We know what freeze-thaw winters and plow blades do to driveways here — and we build for it.

Ready to Start Your Project?

Get In Touch With Ostermiller Construction

Cracked driveway, new patio, a parking lot that needs sealing and fresh stripes? Call or send the form and we will look at the job with you and hand you a free written quote — concrete or asphalt, residential or commercial.

Get a Free Quote

Tell us about your project — we’ll get right back to you.