Serving Billings & the Yellowstone Valley
Ostermiller Construction Concrete & Asphalt · Billings MT
Billings Heights, MT

Asphalt Paving in Billings Heights, MT

Asphalt Paving · Billings Heights, MT

Pavement Built for the Busiest Bench in Billings

Asphalt paving in Billings Heights answers to Main Street. The state counts around 39,000 vehicles a day on that corridor, and for decades it was the one road in and out of the neighborhood. The city engineer put it plainly after the 2010 tornado: Main Street was the only way in or out. That changed in June 2024, when Skyway Drive opened, a five-mile arterial with a multi-use path tying Wicks Lane and Alkali Creek Road to Zimmerman Trail and Highway 3. The city expects it to pull about a fifth of the traffic off Highway 3 and take pressure off Main. For the shops, clinics and lots that front Main Street, none of that changes the daily reality. Customers turn in hard, delivery trucks cut the same corner every morning, and the pavement takes the hit.

Ostermiller Construction paves, repaves and patches asphalt across the Heights from Shepherd, a few minutes up Highway 312. Parking lots and storefronts along Main get the commercial treatment, and the residential side has its own page at asphalt driveways for Heights homes. The concrete work we do up here lives on our Billings Heights page, and the metro-wide service is under asphalt paving and repair for the Billings area. Estimates are free and happen at the surface, in person.

What We Handle in Billings Heights

  • Parking lots for shops and offices along Main Street
  • Repaving of lots that are past patching
  • Residential asphalt driveways across the bench
  • Potholes cut out and rebuilt from the base
  • Hot mix placed and rolled at temperature
  • Grades set so melt leaves the mat
  • Crack sealing, seal coating and striping in-house
  • Free in-person estimates

Free Asphalt Paving Quote in Billings Heights

Tell us about your project — we’ll get right back to you.

Traffic Sets the Spec on Main Street

A lot that fronts Main Street sees more turning traffic in a week than a side-street drive sees in a year. Turning tires twist the surface, and delivery trucks concentrate weight at the same entrance every day. We build thickness where that weight lands: a deeper compacted base and more mat at the approaches and drive lanes, with a lighter section where cars only park.

The new Skyway Drive route will move some through traffic off the bench over time, but Main Street stays the neighborhood's main street. If your lot is alligatored at the entrance and sound in the stalls, the fix is a rebuilt entrance, not a whole new lot. We will say which one you need after we look.

Drainage on the Bench: Ditches, Melt and 57 Inches of Snow

Parts of the Heights still run on old county road sections. Wicks Lane has stretches with no curb or gutter, and the city spent three construction seasons rebuilding the Wicks corridor's storm drainage because the old system could not keep up. Where there is no gutter, the pavement has to do the draining. We grade lots and drives so water leaves the mat and reaches the ditch or the inlet without ponding at the low corner.

Billings averages 57.4 inches of snow a year, and melt that sits on asphalt gets under asphalt. Every freeze pries the crack a little wider. Sealing cracks in the fall is the cheapest maintenance a Heights lot can buy, and a seal coat every few years keeps the surface tight against sun and melt.

Permits: A Lot Needs One, a Driveway Does Not

The Heights sits inside Billings city limits, and the city's permit rules apply. A building permit is required for a parking lot. A driveway or sidewalk that sits entirely on private property and does not support a structure needs none. Where a project touches the curb, apron or public sidewalk, the city requires a separate permit, issues it only to licensed and bonded contractors, and wants 24 hours notice before that work starts.

At the estimate we map which parts of your project fall under which rule and build the permit step into the schedule. For a lot that needs a permit, the drawings and the application happen before the paver shows up. Call (406) 717-4103 to get it started.

View Billings Heights, MT on Google Maps Parking lot striping graphic, Ostermiller Construction asphalt paving, serving Billings Heights MT

Asphalt Paving in Billings Heights

Free, no-obligation estimates across Billings Heights and Yellowstone County.

(406) 717-4103
What You Can Expect

How a Job With Ostermiller Runs

From the first look at the job to the final walk-through, here is exactly how it goes.

1

Look at the Job

We come see the actual job — the slab, the driveway, the lot, and the ground under it. What failed, why it failed, and what the fix really is. No blind quotes over the phone.

2

Straight Quote

You get a free written quote with a real number and a real timeline. It says what's included — tear-out, haul-off, prep, materials — and it holds unless the scope changes.

3

Do the Work

The crew shows up when we said and does the job the way we quoted it — tear-out, base, forms, pour, pave, seal or stripe. Anything unexpected, you hear about it immediately, not on the invoice.

4

Final Walk-Through

We walk the finished work together before we call it done. Clean lines, clean site, old material hauled off, and clear guidance on cure times and care. Done means you say it's done.

Billings Heights FAQ

Asphalt Paving Questions in Billings Heights, Answered

What Billings Heights property owners ask us about asphalt paving. Don't see yours? Give us a call.

Call (406) 717-4103

How much does asphalt paving cost in Billings Heights?
Published 2026 guides put asphalt driveways around $6 to $12 per square foot installed. Parking lots move with mat thickness, base condition and how much old pavement comes out. We measure in person, price the options separately when there are options, and the written estimate is free.
Do I need a permit to pave a parking lot in the Heights?
Yes. The City of Billings requires a building permit for parking lots. Driveways and sidewalks that sit entirely on private property and do not support a structure are exempt. Anything touching the curb line or public sidewalk needs its own city permit. We sort out which rule applies at the estimate.
Can you pave over my existing lot instead of tearing it out?
When the base is sound and the damage is surface-level, an overlay works and saves money. When the lot is alligatored or soft under a truck tire, new mix over failed base is a one-season disguise. We give you the read from the site visit, with numbers for both routes.
When is paving season in the Heights?
Hot mix wants warm air and warm ground, so the window runs late spring into early fall. Montana DOT holds plant mix paving to a November 1 cutoff and stops below a 35 degree surface temperature. The calendar fills front to back, so early calls get the good slots.
Do you stripe and seal the lot after paving?
Yes. Lot striping goes on once the mat has cured, and seal coating follows after the new asphalt has had time to harden. Both are in-house, so one call covers the lot from base to lines. Call (406) 717-4103.
More in Billings Heights

Related Pages for Billings Heights Property Owners

Guides & Resources

Asphalt Paving Guides

Ready to Start Your Project?

Get In Touch With Ostermiller Construction

Cracked driveway, new patio, a parking lot that needs sealing and fresh stripes? Call or send the form and we will look at the job with you and hand you a free written quote — concrete or asphalt, residential or commercial.

Get a Free Quote

Tell us about your project — we’ll get right back to you.