Seal It Before the Sun and the Snow Get Their Turn

Asphalt seal coating in Lockwood is about buying time against three things: sun, water and fuel. Lockwood is the second-largest community in the Billings metro, 7,195 people at the 2020 Census, and still unincorporated. It grew fast enough that the district opened its own high school in the fall of 2019 with a first class of 100 freshmen, built on a $49.9 million bond. The refinery north of the freeway has run since 1949 and now belongs to Par Pacific, which bought it from ExxonMobil in June 2023. Fuel stops, truck yards and shops fill in around the Johnson Lane interchange. Every one of those surfaces bakes in full sun, takes diesel and oil drips all day, and drains to a roadside ditch because Lockwood has no storm sewer. Unsealed asphalt out here goes gray, dry and brittle years ahead of a sealed lot.

Ostermiller Construction seal coats parking lots, truck yards and driveways across Lockwood from Shepherd, a few minutes up the road. Sealing is the second half of the maintenance pair. The first half is patching the failures and sealing the cracks, and we do all of it in one visit. The paving work behind those surfaces is on our Lockwood asphalt paving page, the town-wide picture is on our Lockwood page, and the metro service lives under seal coating for the Billings area.

What We Handle in Lockwood

  • Parking lots and storefronts along Johnson Lane and Old Hardin Road
  • Truck yards and fuel-stop aprons
  • Residential driveways across Lockwood
  • Oil and fuel spots primed before the coat
  • Cracks over a quarter inch filled with hot rubberized sealant
  • Failed sections patched full depth first
  • Coats matched to how hard the surface works
  • Free in-person estimates

Free Seal Coating Quote in Lockwood

Tell us about your project — we’ll get right back to you.

What Kills Lockwood Asphalt: Sun, Water and Fuel

Ultraviolet light is the main driver of asphalt oxidation. The sun dries the binder that holds the stones together, the surface turns gray, and loose aggregate starts to ravel out under tires. Water gets into the cracks that oxidation opens, and with the freeze-thaw swings this valley runs, every winter pries them wider.

Lockwood adds the third enemy. Diesel, oil and hydraulic fluid soften asphalt where they drip, and a truck yard or fuel-stop apron collects them in the same spots every day. A seal coat is a sacrificial layer that takes the sun and the drips instead of the pavement. Industry guidance puts the reseal cycle at every two to three years on hard-working lots, longer on quiet driveways.

The Order of Operations: Patch, Seal Cracks, Prime, Then Coat

Sealer over a pothole hides it for a few weeks. The Colorado Asphalt Pavement Association's published best practices for seal coats spell out the sequence we follow: remove failed pavement to the full depth of the damage and patch it, then let the patch cure 30 to 90 days before sealing. Fill cracks wider than a quarter inch with hot rubberized sealant, and treat cracks over an inch and a half as repairs, not fills.

Then the surface gets cleaned, and oil spots get scraped, scrubbed and primed so the sealer bonds there too. New asphalt is the one surface we will not seal on request. It needs at least 30 to 90 days of warm weather to shed its surface oils, and the check is simple: cast a gallon of water across it, and if the water sheets out without oil rings, the mat is ready.

Timing a Coat Around Lockwood Weather and Lockwood Traffic

Sealer is an emulsion, and it cures by drying. The published rules are firm: pavement at 50 degrees or better, air at 50 and rising, no freeze in the next 24 hours, and no rain within eight hours of finishing. That makes the Lockwood season summer into early fall, with a forecast check the morning of the job.

The other clock is yours. A sealed surface is dry to the touch in a few hours but should stay closed to vehicles for 24 to 48 hours, so lots get coated in halves and truck yards get staged around shifts. One more date matters out here: MDT plans to rebuild the Johnson Lane interchange starting in late 2026, and the easy time to get a lot sealed is before those work zones squeeze access. Call (406) 717-4103 and we will come look.

View Lockwood, MT on Google Maps Asphalt crack sealing graphic, Ostermiller Construction seal coating, serving Lockwood MT

Seal Coating in Lockwood

Free, no-obligation estimates across Lockwood and Yellowstone County.

(406) 717-4103
What You Can Expect

How a Job With Ostermiller Runs

From the first look at the job to the final walk-through, here is exactly how it goes.

1

Look at the Job

We come see the actual job — the slab, the driveway, the lot, and the ground under it. What failed, why it failed, and what the fix really is. No blind quotes over the phone.

2

Straight Quote

You get a free written quote with a real number and a real timeline. It says what's included — tear-out, haul-off, prep, materials — and it holds unless the scope changes.

3

Do the Work

The crew shows up when we said and does the job the way we quoted it — tear-out, base, forms, pour, pave, seal or stripe. Anything unexpected, you hear about it immediately, not on the invoice.

4

Final Walk-Through

We walk the finished work together before we call it done. Clean lines, clean site, old material hauled off, and clear guidance on cure times and care. Done means you say it's done.

Lockwood FAQ

Seal Coating Questions in Lockwood, Answered

What Lockwood property owners ask us about seal coating. Don't see yours? Give us a call.

Call (406) 717-4103

How much does seal coating cost in Lockwood?
Published guides put driveway sealing around $1 to $2 per square foot with labor, and big lots land lower per foot. Prep is the real mover: patching, crack sealing, oil-spot priming and the number of coats. A small driveway carries a minimum trip charge. We measure in person and put the price in writing, free.
How often should a Lockwood parking lot be sealed?
Industry guidance runs every two to three years for hard-working commercial lots and up to three or four years for lighter-traffic surfaces. Sun exposure and truck traffic push a Lockwood lot toward the short end. A quiet driveway can stretch longer. The tell is color: when the surface has gone gray, it is overdue.
Can you seal my brand-new asphalt?
Not right away. New asphalt has to shed its surface oils first, which takes at least 30 to 90 days of warm weather, and many lots paved late in the season wait until the following summer. Sealing too early traps the oils and the coat peels. We run a water-sheeting test before we commit.
Will sealer fix the potholes and cracks in my lot?
No. Sealer is a surface protectant, and it will not hold over a hole or a wide crack. Potholes get cut out and patched with hot mix, cracks wider than a quarter inch get hot rubberized sealant, and the coat goes on after those repairs have cured. That sequence is what makes a seal coat last.
How long does the lot stay closed?
Sealer is dry to the touch in a few hours in warm weather and safe to walk on later the same day, but vehicles should stay off for 24 to 48 hours so the coat cures hard. We coat lots in halves and stage yards around shift changes so the business keeps running. Call (406) 717-4103 to plan it.
More in Lockwood

Related Pages for Lockwood Property Owners

Guides & Resources

Seal Coating Guides

Ready to Start Your Project?

Get In Touch With Ostermiller Construction

Cracked driveway, new patio, a parking lot that needs sealing and fresh stripes? Call or send the form and we will look at the job with you and hand you a free written quote — concrete or asphalt, residential or commercial.

Get a Free Quote

Tell us about your project — we’ll get right back to you.